Hot Runner Jar Neck Preform Mould

Products

Hot Runner Jar Neck Preform Mould

Hot Runner Jar Neck Preform Mould

G-PLAS PRECISION MACHINERY TO MAKING PET PREFORM MOLD HAVE BEEN 30 YEARS IN NINGBO ZHEJIANG CHINA. FROM 12-CAVITY TO 96-

Send your inquiry

DESCRIPTION

Basic Info
Model NO. GK08
Cavity Quantity 8
Customized Non-Customized
After-sales Service Engineers Available to Service Machinery Oversea
Weight 76g
Neck 110mm
Voulme 2500ml--5500ml
Transport Package Wooden Case
Specification 1300kg
Trademark G-PLAS
Origin China
HS Code 8480719090
Production Capacity 80
Product Description
G-PLAS PRECISION MACHINERY TO MAKING PET PREFORM MOLD HAVE BEEN 30 YEARS IN NINGBO ZHEJIANG CHINA.
FROM 12-CAVITY TO 96-CAVITY HOT RUNNER AND COLD RUNNER MOLD . MAKING FOR WATER BOTTLES , JUICE BOTTLES ,
Preform mould photos

 


6-CAVITY HOT RUNNER BIG HEAVY GRAM PREFORM MOULD 8-CAVITY HOT RUNNER JAR PREFORM MOULD

 


32-CAVITY PREFORM MOULD 48-CAVITY PREFORM MOULD

 

Preform sample

 

III,preform Mould specifications

Cavity Number22g Preform Length:94mm32g Preform Length:120mm42g Preform Length:130mm
Dimension
(mm)
Weight
(kg)
Dimension
(mm)
Weight
(kg)
Dimension
(mm)
Weight
(kg)
4(1*4)500*290*430550500*290*445600500*290*455680
6(2*3)430*370*400760430*370*415850430*370*425900
8(2*4)490*370*435810490*370*450900490*370*460970
12(2*6)630*370*4351020630*370*4501100630*370*4601180
16(2*8)750*370*4801240750*370*4951350750*370*5051450
24(3*8)830*440*5001880830*440*5151950830*440*5252060
32(4*8)830*580*5152360830*580*5302550830*580*5452600
48(4*12)1065*580*52529301065*580*54030501065*580*5553150
72(6*12)1140*830*56043201140*830*57544501140*830*5804600


Note:Above specifications are subject to change without prior notice.Dimesion means Height x Width x Thickness

Name Description
Products' info we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#,50#,P20,H13,718,2738,NAk80,S136,SKd61 etc
Mould Base LKM,HASCO ect .
Cavity Multi
Runner Hot/cold
Mould Design3D/2D Drawing
Design Days 3 days
Design Software UG,PROE,CAD,CAE,CAM,CAXA ect
Plastic MaterialPP,PC,PS,PE,PU,PVC,ABS,PMMA ect
Mould Life 300,000-3,000,000 shots
Injection SystemPin-point-gate
Polish SystemMirror Polish
Payment30% of Deposit by T/T,70% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step
1.R&DWe support customer R&D. Make the files or improve the design if you needed
↓↓↓
2.Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓↓↓
3.Negotiation The quality ,price ,material,delivery time .payment item.ect
↓↓↓
4.Mould Design 3-5 days for mould and product 3D/2D drawing design
↓↓↓
5.MouldAccording to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 25-60 days
↓↓↓
6.Mould TestingWhen moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference.
↓↓↓
7.Sample shoot If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory
↓↓↓
8.Delivery Delivery goods by sea or by air ,according customers requirement

spare parts follow machine and working CNC MACHINE
SHIPPING LINE FROM FACTORY NINGBO TO OVERSEA
FAQ
Q1: Are you a factory or trading company?
A: We are a factory .
Q2: Where is your factory located?
A: Our factory,near Shanghai, located in Ningbo,China
Q3: what is your trade term?
A: normally FOB NINGBO, if customer country requires, also can accept L/C at sight.
Q4: what is your payment term?
A:50% down payment against order confirmation, 50% balance payment prior shipment.
Q5: Have blow machine 100% assemnled well in stock?
A: No. All blow machine will be assembly produced according to your order.
Q6: what is your delivery time?
A: usually in 60days, depends on your projects.
Q7: what about installing in customer factory?
A: after machine arrived at your factory, please prepare water, electric,air and preform, then we will arrange engineer to install machine and train your workers, the longest time to free install shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q8:guarantee time?
A: one guarantee, not man-made.